I guess this phase of construction is called "watching concrete dry".
It's super exciting.  And super affirming that they're going to finish on time.

When I drove by the house this morning they had chalked out where all the walls would go - so it was neat to 'walk through' our house and see where everything would be.  Everything still seems impossibly small, but I'm sure that's because there are no walls and my perception is with the great outdoors.  

I didn't even check my camera to see if the chalk lines showed up.  And they didn't.  So here is a shot of our concrete slab. 

Here you can see they knocked down an additional tree.  It was about 7 feet from the foundation, and although the builders/engineers said it was fine to be that close to the slab - it made The Husband very nervous.  His grandmother's house was wrecked with foundation issues and the trees seem to be an easy target.  I was sad to see this one go, but it wasn't worth The Husband's irrational fears for the next thirty-something years. 

You can see it here, before the slaughter:
(photo taken from the back side of the house)


Monday, April 4, 2011

Construction: Days 10-13

With word that the foundation would be poured in the latter part of this week, I snuck out of work a little early on Friday and drove straight to the home site.  Sadly, there was no foundation - but it still had some pretty big changes.  

you can see here that they have dug trenches in a grid throughout the house.  I'm assuming this will all be filled with concrete when the foundation is poured to make it more stable. 

You can see the red/blue pipes for hot/cold water that will run through the house.  

Tapped into the sewer lines.


The husband and I went out again on Saturday afternoon to see if they poured that morning.
We were so pleased to see the concrete truck still there - and everyone working!

After they finished pouring they had some kind of 'buffer' that they used over the entire foundation

Basements don't really exist in Texas, but you can see the slight dip in the foundation where the garage and front porch will be.  There's a dip in the back for the patio as well.  


Hip Hip Hooray!  They're now saying we should be able to move in no later than June 15th.  We're down to 73 days.  They took forever to get started, but I think is going to be a quick build!!